Anglais
Page d'accueil - Librairie en ligne
www.ocde.org
https://twitter.com/OECD_Pubs   http://www.facebook.com/OECDPublications   http://www.youtube.com/oecdilibrary   http://www.linkedin.com/groups/OECD-Publications-4645871  
Identifiant  |   Votre compte  |   Votre bibliothèque  |   Voir panier Aide
Rechercher       dans 
  Conseils de recherche   •   Recherche avancée
Vous êtes sur > Librairie en Ligne de l'OCDE > Fiche du produit
Retour

Radioactive Waste Management
Considering Timescales in the Post-closure Safety of Geological Disposal of Radioactive Waste
OECD, Nuclear Energy Agency. Published by : OECD Publishing , Date de parution:  24 mars 2009
Pages: 160 , Langue: Anglais
Version: Livre (Broché) + PDF gratuit
ISBN: 9789264060586 , Code OCDE: 662009041P1
Prix:   €40 | $54 | £34 | ¥5000 | MXN720 , Frais de livraison inclus
Disponibilité: Disponible
Ajouter au panier Envoyer à un collègue    

Autres versions:  Livre électronique - Format PDF

Titres connexes

Détails

Description
A key challenge in the development of safety cases for the deep geological disposal of radioactive waste is handling the long time frame over which the radioactive waste remains hazardous. The intrinsic hazard of the waste decreases with time, but some hazard remains for extremely long periods. This report reviews the current status and ongoing discussions of this issue, addressing such issues as ethical principles, the evolution of the hazard over time, uncertainties in the evolution of the disposal system (and how these uncertainties themselves evolve), the stability and predictability of the geological environment, repository planning and implementation including regulatory requirements, siting decisions, repository design, the development and presentation of safety cases and the planning of pre- and post-closure institutional controls such as monitoring requirements.

Tables des matières:
  - Executive Summary
  - Introduction
  - General Considerations in the Handling of Issues of Timescales
  - Repository Siting and Design and the Levels of Protection Required in Regulation
  - National Policies in the Planning of Pre and Post-Closure Actions
  - Developing and Presenting a Safety Case
  - Conclusions and Recommendations
  - Appendix 1 - The Questionnaire
  - Appendix 2 - Acronyms
  - Appendix 3 - Context for the Responses
  - Appendix 4 - Observations from the Responses
Retour Haut de la page